Sunday, May 13, 2012

Center Divider Installation


Area prepped & primed for the Center Divider installation.

Trimming the replacement panel to fit...

..and test fitting to get it right.

Punched tack hole on the top lip of the replacement panel & the bottom of the heater channel

Tack welded top & bottom of spot welds.

Lap welded top of panel (behind door post) to existing structure. 



Painted & primed....




..ready for the Convertible Re-inforcing panel to be installed 




No comments:

Post a Comment