Area prepped & primed for the Center Divider installation.
Trimming the replacement panel to fit...
..and test fitting to get it right.
Punched tack hole on the top lip of the replacement panel & the bottom of the heater channel
Tack welded top & bottom of spot welds.
Lap welded top of panel (behind door post) to existing structure.
Painted & primed....
..ready for the Convertible Re-inforcing panel to be installed
No comments:
Post a Comment