Patch fabricated & installed...
...as well as one in the front.
Painted and ready to install the outer panel.
The panel is fit in place and clamped for tack welding.
Tack welded in place.
I need to finish tack welding the top seam, but wanted to prime the panel. So i masked the weld area before I primed it.
I'll tack the top seam later this week.
No comments:
Post a Comment